| Country |
Service |
Customer |
Year |
| TUNISIA |
Horizontal directional drilling of HDPE ducts ø 125 and ø 160 |
GTN - TUNISIANA |
2008 - 2009 -2010 |
| TUNISIA |
Horizontal directional drilling of HDPE ducts ø 110 |
GTN - ORANGE TUNISIE |
2008 - 2009 - 2010 |
| TUNISIA |
Horizontal directional drilling of steel pipes ø 219 |
STEG |
2009 - 2010 |
| TUNISIA |
Geodetection of underground networks (80 Km) |
TUNISIA TELECOM |
2010 - 2011 |
| TUNISIA |
10 Km of optic fiber underground network construction in urbain areas with CLEANFAST Process: geodetection, trenching and cold milling. Loops in Grand Tunis |
GTN - TUNISIE TELECOM |
2010 |
| TUNISIA |
40 Km of optic fiber underground network construction in urbain areas with CLEANFAST Process: geodetection, trenching and cold milling. Loops in Grand Tunis |
GTN - ORANGE TUNISIEÂ |
2009 - 2010 |
| TUNISIA |
25 Km of optic fiber underground network construction in urbain areas with CLEANFAST Process: geodetection, trenching and cold milling. Loops in Grand Tunis |
GTN - TUNISIANAÂ |
2010 |
| MOROCCO |
Projects Management Technical Assistance |
MCS - WANA |
2007 - 2008 |
| ALGERIA |
Projects Management Technical Assistance |
ALCATEL LUCENT |
2009 |
| LIBYA |
Projects Management Technical Assistance |
MCS - ALCATEL LUCENT |
2007 - 2008 - 2009 - 2010 |
| LIBYA |
Optic fiber networks: blowing, splicing and testing of optic fiber cables |
MCS - ALCATEL LUCENT |
2008 - 2009 - 2010 |
| TURKEY |
Geodetection of underground networks |
MCS - TURKCELL |
2009 |